My Line of Credit Is Not Big Enough
Your line was the right size for the company you were when the bank approved it, and you have grown since. Why the cap sits where it does, what an increase request needs, and what to do if the answer is no.
Your line is fully drawn. You pay it down when the agency pays, draw it again within a week, and the same thing happens next month.
The line is not the problem. It was the right size for the company you were when the bank approved it, and the company has grown since. That is a good problem to have, and it is still costing you money, because a line with nothing left on it means you are turning down work or funding it yourself.
Why is my line of credit capped where it is?
A bank approves a line on your historical financials. Two to three years of statements and tax returns, profitability, the owners’ personal position, and coverage tests: debt service coverage and fixed charge coverage. Those tests ask whether the earnings you have already produced can carry the payments.
The contract you just won is supporting evidence. It is not the basis of the decision.
That is why a company that has doubled in a year is still measured against the company it used to be. Your growth is in the awards you hold, and those awards are not in the financials yet. A line approved last year was approved on the year before that.
There is also a term in the agreement that matters here and usually gets read once and forgotten. Your bank holds a lien on the assets, and the agreement will normally limit what other debt you can take on. That term decides whether you can add anything alongside the line later, which is covered further down.
None of this is the bank being unreasonable. Banks lend against what a company has already done. Your growth is in work you have not performed yet, so the two do not line up.
How do I get my line increased?
Give the bank what its credit test actually asks for.
Current financials, not just last year’s. The argument for a larger line is that the company is bigger. Last year’s statements are the evidence against you, so bring interim numbers that show where you are now.
Your coverage position. Debt service coverage and fixed charge coverage are the tests. If you know those numbers before you ask, you know roughly what the bank will say, and you can address a weak one rather than be told about it.
The awards, not the pipeline. A signed award with a period of performance and a ceiling is real. A bid you expect to win is not.
Receivables that are explained. Federal terms are typically net 30 for a prime and net 45 for a subcontractor billing a prime, and the clock starts at the invoice rather than at the work. Your aging will look slower than a commercial company’s for that reason alone. Say so, so that nobody reads normal government timing as a collection problem.
A specific number and how you got to it. Ask for a bigger line and you will get a small one. Tell the bank you need $400,000 to staff a named award, show what it costs you each month and when the agency pays, and the bank has something it can actually approve.
What if the bank says no, or says not enough?
A no is usually about what the bank is allowed to lend against, not about whether your business is sound. It is also not the end of the options.
| Situation | What usually fits |
|---|---|
| The line is fine and one award is the problem | Contract line of credit sized to that award |
| A single agency is most of your revenue | Invoice factoring against those invoices |
| The shortfall lands on pay dates | Payroll funding timed to the cycle |
| Spending is front-loaded on a new award | Mobilization funding |
| You need the asset rather than working capital | Equipment financing |
The first row surprises people. A bank line you are happy with does not have to be replaced. A facility sized to one award can sit alongside it, with the bank keeping its collateral and the other lender taking a position only in the receivables from that one contract.
That needs both lenders to agree in writing, which is an intercreditor agreement. The lenders negotiate it between themselves rather than through you, and it only happens if your bank is willing. A new award that did not exist when the line was approved is the easiest case to make, because nothing the bank already has is being taken away from it.
Can I have a bank line and contract financing at the same time?
Often, yes, and it is a normal structure once a contractor is growing faster than a bank line can follow. It depends on your bank permitting it, so start there rather than assuming it.
Timing matters more than most people expect. Putting two facilities in place at once is straightforward, and so is adding one against a new contract. Asking your bank to release collateral months after it approved the line is harder, because you are asking it to accept less security than it agreed to.
The case that gets a yes is a new award that bills real money every month, where funding it properly leaves you stronger. The case that gets a no is one where nothing has changed except that you would like more money.
Talk to both sides early. A lender who has done this before will want to speak to your bank before running a full underwrite, which gets you the answer at the start rather than after three weeks of paperwork.
Does a bigger line always cost more?
Not per dollar, and often the opposite.
A bank line is normally the cheapest money available to a contractor, so if you can qualify for a larger one, take it. Contract financing costs more per dollar drawn, because it is built for speed and it underwrites the award rather than your financial history.
That comparison leaves out how long you hold the money. An increase you do not draw costs you very little. A contract facility drawn hard through a ramp and repaid as the agency pays can cost more per dollar while being outstanding for a fraction of the time. Compare the cost of carrying the work, not the headline number.
Compare both against the choice you are actually making, which is often turning down the award or funding it out of your own pocket.
Common questions
Why will my bank not increase my line of credit? A bank line is approved on historical financials and coverage tests, which measure what the company has already produced. A contractor who has grown quickly is therefore measured against the company they used to be, because the growth sits in awards that have not yet run through the financials.
How much of a line of credit can a government contractor get? It depends on what is being underwritten. A bank line is sized on your financial history and coverage position. A facility sized against a specific award is assessed on that contract: its value, the agency paying it, and whether you can perform it. The second route is why a contractor who has just grown can reach more than their historical numbers would support.
Can I get a second line of credit? Not usually a second general line, because your bank holds a lien on the assets and the agreement normally limits additional debt. What is common is a separate facility secured by one specific contract, sitting alongside the bank line, with both lenders agreeing in writing.
What is an intercreditor agreement? A written agreement between two lenders setting out which assets each one has a claim on. It is what allows another lender to advance against the receivables from one award while your bank keeps its position in everything else. The lenders negotiate it between themselves.
Should I replace my bank line or add to it? If the bank line is working, keep it, because it is almost always cheaper than contract financing. Adding a facility alongside it depends on your bank agreeing, so have that conversation before you plan around it.
How fast can an increase or a new facility happen? A bank increase runs on the bank’s credit cycle and needs current financials. A contract facility is faster, and its pace is set by the award documents and the assignment of claims rather than by underwriting. Where an intercreditor agreement is needed, start that conversation first, because it is the step most likely to add weeks.