How to Invoice in WAWF So a DoD Contract Pays on Time
Most slow DoD payments start with the invoice rather than the agency. What Wide Area WorkFlow needs from you, why invoices are returned, and how a return moves the pay date.
A DoD contract pays on time when its invoice in Wide Area WorkFlow (WAWF) is accepted as a proper invoice on the first submission, which means it uses the document type the contract specifies, carries the routing codes from the contract’s payment instructions, and matches the contract line by line. The payment due date is counted from the day the billing office receives a proper invoice, so an invoice that is returned for correction does not start the clock at all, and the time spent correcting and resubmitting it is added to the period in which the contractor is carrying payroll.
For a contractor whose revenue has just stepped up, that period is the expensive part. Payroll on a larger award is paid every cycle regardless of where the invoice stands, so each returned invoice extends the stretch of costs that have been incurred but not yet paid.
What is WAWF, and who has to use it?
WAWF is the Department of Defense system for submitting payment requests and receiving reports electronically. It sits within the Procurement Integrated Enterprise Environment (PIEE), the DoD portal through which contractors reach it. The requirement to invoice electronically comes from DFARS 252.232-7003, and the instructions specific to each contract come from DFARS 252.232-7006, the WAWF Payment Instructions clause.
To use the system, the clause requires a contractor to have a designated electronic business point of contact in the System for Award Management and to register for WAWF itself. Those two steps are worth completing well before the first billing period closes on a new award, since an invoice cannot be submitted until both are in place.
The obligation sits with the prime. A subcontractor bills the prime under the terms of the subcontract rather than through WAWF, although a sub paid on the prime’s cycle feels every delay in the prime’s invoice.
Which WAWF document type should I use?
The contract answers this, not the system. Paragraph (f)(1) of the WAWF Payment Instructions clause sets the document type for each kind of contract line, and on fixed-price lines the contracting officer fills in which type applies. An invoice submitted under a different type is not the payment request the contract calls for.
| Contract line | Document type under DFARS 252.232-7006 |
|---|---|
| Cost-type, including labor-hour and time-and-materials | Cost voucher |
| Fixed-price services with no deliverable shipped | Invoice 2in1, or the invoice and receiving report the contracting officer specifies |
| Fixed-price lines that ship a deliverable | The invoice and receiving report the contracting officer specifies |
| Progress payments based on costs incurred | Progress payment request |
| Performance-based payments | Performance based payment request |
The clause also notes that a “combo” document type can create an invoice and a receiving report in a single step where the combination applies. Labor-heavy service contracts, which are most of what we fund, typically fall in the first two rows, so the cost voucher and the Invoice 2in1 are the two types most service contractors work with every month.
Where do I find the routing codes for a WAWF invoice?
The routing codes are in the Routing Data Table in paragraph (f)(3) of the same clause, inside your contract or task order. The contracting officer fills it in, and the clause directs the contractor to use that table, and only that table, to complete the routing fields in WAWF.
Most of the fields are DoD Activity Address Codes (DoDAACs), six-character codes that each identify a unit, activity or organization. The table includes the Pay Official, Issue By, Admin and Inspect By DoDAACs, the ship-to and mark-for codes, the service approver and service acceptor, the local processing office and, on cost-type work, the DCAA auditor. Each code tells WAWF where the document goes next, so a code entered from an earlier contract or from memory sends the invoice to an office that is not set up to act on it.
The clause applies to the contract “or task or delivery order”, and a new task order can carry its own table. A contractor who has added task orders under an existing vehicle should check each order’s table rather than reuse the codes from the first one.
What makes an invoice proper for prompt payment?
A proper invoice is one that contains everything FAR Subpart 32.9 requires, and only a proper invoice starts the payment clock. Under FAR 32.905(b), it must include:
- the contractor’s name and address
- the invoice date and invoice number
- the contract number, including the order number and line item number
- a description, quantity, unit of measure, unit price and extended price for what was delivered or performed
- shipping and payment terms
- the name and address of the contractor official to whom payment is sent, which must be the same as in the contract or in a proper notice of assignment
- the name, title, phone number and mailing address of the person to notify if the invoice is defective
- the taxpayer identification number and EFT banking information, where agency procedures require them on the invoice
Two of those items deserve particular attention from a contractor that is growing. Correct EFT banking information has to be on file through the System for Award Management even where it is not printed on the invoice, so a change of bank that is not updated there can hold up an otherwise correct invoice. And where contract payments have been assigned to a lender, the payee on the invoice has to match the notice of assignment, because the payment office will pay only the party the contract and the notice identify.
What happens when a WAWF invoice is rejected?
When an invoice is not proper, the billing office must return it within 7 days of receipt and state the reasons it is not proper. If the office misses that deadline, the due date is adjusted when any interest penalty is calculated. The corrected invoice is then treated as a new submission, and the payment clock runs from the day the billing office receives it.
Acceptance runs alongside the invoice. On most invoices the due date is the later of the 30th day after the billing office receives a proper invoice and the 30th day after the government accepts the supplies or services. In WAWF, acceptance is recorded by the acceptor named in the routing table, so an invoice can be correct and still wait on an acceptor who has not yet acted. For the purpose of computing interest only, acceptance is deemed to occur on the 7th day after performance unless there is a disagreement over quantity, quality or compliance with the contract.
If the due date falls on a weekend or a federal holiday, the payment office may pay on the next working day without owing interest. If it pays later than the due date on a proper invoice that has been accepted, the Prompt Payment Act requires it to pay an interest penalty, and FAR 32.907 says that penalty is paid automatically, without a request from the contractor. Interest compensates for the delay after the fact; it does not cover a payroll that falls due while the invoice is being corrected.
How long does DoD take to pay a WAWF invoice?
Payment terms are typically net 30 for a prime billing the agency, and a contractor invoicing in WAWF is the prime. The terms start only when you invoice, however, and you can invoice only once the work has been performed. A contractor billing monthly on net 30 therefore carries about 60 days of costs before the first payment arrives. That assumes the invoice goes in on time and is correct. A late or returned invoice pushes the payment out, which is why clean invoicing in WAWF has a direct effect on working capital.
How do contractors cover payroll while an invoice is in WAWF?
The usual answer is to fund the work already performed, and which facility fits depends on how far that work has moved through billing. Before the invoice exists, payroll funding draws against the hours worked. Once the invoice has been submitted, invoice factoring advances against it. Where payroll is one of several costs on a larger award, a contract line of credit covers the whole set. The article on making payroll while waiting on government payment works through how many pay runs sit in that gap and which option suits each stage.
Accurate invoicing and financing work together rather than as substitutes. A facility covers the expected gap between payroll and payment, and an invoice that is right the first time keeps that gap at its expected length.
Common questions
Is WAWF the same as PIEE? Not exactly. PIEE, the Procurement Integrated Enterprise Environment, is the DoD portal, and WAWF is the invoicing and receiving capability within it. Contractors register and sign in through PIEE to submit invoices in WAWF.
What is a DoDAAC on a WAWF invoice? A DoD Activity Address Code is a six-character code that identifies a unit, activity or organization. WAWF uses the DoDAACs in the contract’s routing data table to send the invoice to the right paying, administering and accepting offices.
Do subcontractors invoice through WAWF? No. A contractor billing in WAWF is the prime. A subcontractor bills the prime under the subcontract’s terms, and the prime submits its own invoice to DoD in WAWF. The sub’s payment timing still depends on the prime being paid, so delays in the prime’s invoice tend to reach the sub as well.
Does DoD pay interest on a late invoice? Yes, when the invoice was proper, the work was accepted and payment was made after the due date. Under FAR 32.907 the interest penalty is paid automatically. Interest does not accrue on an invoice that was returned as improper until a proper one is received.
Who accepts an invoice in WAWF? The acceptor identified in the routing data table, whose DoDAAC the contracting officer enters in the contract. The due date is generally the later of 30 days after a proper invoice is received and 30 days after acceptance, so acceptance timing matters as much as the invoice itself.
This article is for educational purposes only and does not constitute advice for your specific business.